The Misamis Occidental I Electric Cooperative, Inc. (MOELCI I) is an electric distribution utility duly registered with the National Electrification Administration (NEA) with office address in Magcamiguing, Calamba, Misamis Occidental. It was organized and incorporated on August 18, 1972 with an area coverage of one (1) city, Oroquieta City and seven (7) municipalities, namely: Aloran, Lopez Jaena, Plaridel, Calamba, Baliangao, Sapang Dalaga, and Concepcion. Each district is represented by one Board of Director.
Location
Main Office:
Facilities
Main Office: MOELCI-1 St, Magcamiguing, Calamba, Misamis Occidental
Area Office: Poblacion 1, Oroquieta City, Misamis Occidental
Existing substation facilities and total capacity
10MVA – Villaflor, Oroquieta City, Mis. Occ.
5MVA – Bunawan, Calamba, Mis. Occ.
Distribution lines constructed
Double Circuit 2.07 kms
Three Phase 101.010 kms
V Phase 37.554 kms
Single Phase 468.632 kms
Open Secondary 224.908 kms
Under Built 389.822 kms